long week of tough work…

 

With the help of Rick and his dad, great work was accomplished at the end of the week. The frame of the entry is up and ready for cladding, electrical wiring is 100% done. The team worked with Rick on patio details and even though the patio did not go up as planned, we are very close of reaching this goal.

electrical discussion

electrical discussion

pulling electrical wire

Foster working on frame for front entry brow

entry brow is up

entry brow is up

flitch column detail drawing

flitch column detail drawing

flitch plate column detail

flitch plate column detail

Rick and Shawn welding patio beam

Rick and Shawn welding patio beam

column assembly

column assembly

Finally at the end of the day we get to test the columns and see if they are level.

flitch detail

flitch detail

The columns are level!! now we can take them down and go home.

 

 

 

 

 