It’s definitely fall here in Bluff, and we’re all back for more fun in Session 3. Some of the goals for the session include: rough plumbing, pulling electrical wire and installing boxes, pouring entry slab and patio piers, grinding the shower and bathroom floor, and installing furring and gutter on the south wall. We also installed one additional window in the main bedroom on the south elevation. The group worked hard over the break to finish drawings and continue mock-ups, so we all get to see more of the details this week in our design meetings. It’s exciting to see things coming together!

IMG_2450

electrical in the bedroom

IMG_2463 IMG_20131008_132054_078
IMG_2458

entry slab footing is dug and ready for formwork

 

 